Backyard design-build
Backyard design-build in Phoenix, priced before we dig.
One designer draws the whole yard, turf, pavers, fire, shade and lights, with square feet on every zone and one fixed price. Then one crew builds it.
- Design quote
- Free
- Typical yard
- $9k to $28k
- Build
- 2 to 5 days
- Warranty
- 5 years

The drawing
See the plan. Then see it standing up.
Every plan comes as a drawing with square feet on every zone. Want to see it in 3D before you sign? The 3D preview is $350, and it comes off your build.
- Satellite measurements before we visit
- Square feet on every zone, so you can check the math
- Materials and colors named, not “turf, TBD”
- The HOA package, ready to sign
A sample plan for a 60 by 35 ft Valley backyard.
How it works
From satellite to fire pit in about three weeks.
The design takes days. HOA approval takes one to four weeks. The build takes two to five days.
- 01
Send your address
We pull your yard from satellite and measure it before we call.
DAY 0 - 02
Design visit
Thirty minutes to check grade, drainage, sprinkler lines and what’s under the dirt.
DAY 2 - 03
Your plan and fixed price
A drawing with square feet on every zone, materials named and one price.
DAY 4 - 04
HOA approval
We build the submittal package. You sign it and send it.
1 TO 4 WEEKS - 05
Arizona 811 and demo
Buried lines marked, then the dirt, rock or dead grass comes out.
BUILD DAY 1 - 06
Base, then the build
Compacted base, pavers, fire and turf, in that order.
BUILD DAYS 2 TO 4 - 07
Walkthrough
We walk it with you and hand over the warranty and the care guide.
LAST DAY
Typical builds
What a whole backyard costs.
Four sizes we build every month. Your plan prices your actual yard.
| Build | Typical price | As low as | What’s usually in it |
|---|---|---|---|
| Starter yard | $9,000 to $14,000 | $187/mo | Turf lawn, a small paver pad, desert border |
| Family yard | $14,000 to $24,000 | $291/mo | Turf, a paver patio, gas fire pit, desert border |
| Full backyard | $24,000 to $45,000 | $498/mo | Adds a pergola, lighting and a putting green |
| Estate yard | $60,000 and up | $1,245/mo | Travertine, fire lounge, custom shade, 25 or more lights |
FAQ
Design-build questions.
Do I pay for the design?
Can I build it in phases?
Do you pull permits?
Who calls 811?
What if we hit caliche?
Next step
See it before we dig.
Send your address and get a plan with a fixed price in 48 hours. Most Valley backyards run $9,000 to $28,000, from about $187 a month.
Got it, friend. Tess will text you from (480) 790-3036 within the hour, 7 AM to 7 PM.
This is a concept site by Noventa, so nothing was sent. Want one like it?

