The install day
Crew at 6:30. Floor by dark.
One day, hour by hour. Drag the sun across the dial to walk through it, or scroll for the long version.
- Start
- 6:30 AM
- Walk on it
- 6:30 PM
- Park on it
- Next morning
- Crew
- 3 people

6:32 AM · Walkthrough · Mesa
The day on a dial
Drag the sun.
Every step of the install day, with the time it usually happens.






6:30 PM
Walk on it
Next morning
Park on it
6:30 AM
Walkthrough and tape
Nate walks the slab with you, marks every crack and tapes the walls. Your car is out, the door is up.
Nate walks the slab with you, marks every crack and tapes the walls. Your car is out, the door is up.
A walk-behind grinder takes the top off the slab, down to clean, open concrete. The shroud and the HEPA vacuum keep the dust out of your house.
Cracks get a polyurea filler, flush and ground smooth. Stem walls get the same prep as the floor.
A tinted polyurea base goes down, and we throw the flake by hand until the base can’t hold one more chip. Before the garage hits 90.
The loose flake comes up, the floor gets scraped smooth, and we vacuum every corner twice.
A UV-stable polyaspartic clear coat, rolled out by hand, with grit in it if you asked for it.
Socks only tonight. The tape comes off, Nate does the final walk with you, and you get the warranty in writing.
Twenty-four hours after the clear coat, the car goes back in. Shelves and heavy boxes the same day.
Step by step
The long version.
What happens, why, and what you’ll hear from the driveway.
- 6:30 AM
Walkthrough and tape
Nate walks the slab with you, marks every crack and tapes the walls. Your car is out, the door is up.
- 7:00 AM
Diamond grind
A walk-behind grinder takes the top off the slab, down to clean, open concrete. The shroud and the HEPA vacuum keep the dust out of your house.
- 9:30 AM
Cracks and stem walls
Cracks get a polyurea filler, flush and ground smooth. Stem walls get the same prep as the floor.
- 10:30 AM
Base coat and flake
A tinted polyurea base goes down, and we throw the flake by hand until the base can’t hold one more chip. Before the garage hits 90.
- 1:00 PM
Scrape and vacuum
The loose flake comes up, the floor gets scraped smooth, and we vacuum every corner twice.
- 2:00 PM
Clear coat
A UV-stable polyaspartic clear coat, rolled out by hand, with grit in it if you asked for it.
- 6:30 PM
Walk on it
Socks only tonight. The tape comes off, Nate does the final walk with you, and you get the warranty in writing.
- Next morning
Park on it
Twenty-four hours after the clear coat, the car goes back in. Shelves and heavy boxes the same day.
Why first light
Heat eats working time.
A coating’s working time roughly halves for every 18 degrees. Drag the slab temperature and watch.
Slab temperature
70°F
About 35 minutes of working time per batch

1:05 PM · Scrape and vacuum · Gilbert
What you do
Almost nothing.
Empty the garage the night before. Be there at 6:30 for the walkthrough and at the end for the walk. In between, the garage is ours and the door to the house stays closed.
Next step
Pick your install day.
Send a few photos and your ZIP. Lena texts back a price range within the hour, or sets a time for Nate to bring chips by. Free either way.
Got it, friend. Lena will text you from (480) 790-3036 within the hour with a price range, or a time for Nate to bring chips by.
This is a concept site by Noventa, so nothing was sent. Want one like it?